The ‘Setu Bharatam’ project aims to make all national highways free from railway level crossing by 2019 to ensure road safety. Here are some facts about the ambitious project, named Setu Bharatam: Standing lines. As per the latest estimates, the Setu Bharatam program would cost somewhere around ₹102 billion. Making all national highways free of railway level crossings, by 2019, by building railway over bridges/under passes. Total outlay of 20, 800 crore rupees. The main objectives of the program stand to be the construction of National Highways which would be absolutely free of railway crossings by 2019. 5. 50,000 crore Setu Bharatam project. Under the project, 208 places have been identified for construction of rail over-bridges or underpasses. Completion Date: Phase I – 2022 & Phase II – 2024 (Expected) Bharatmala project map: Gujarat to Mizoram with a national highway & coastal states from Maharashtra to West Bengal by road network; Also read: India’s first underwater Metro Rail in Kolkata. The 72nd episode was aired on 27 December 2020. Preparing for Competitive exams? Main objectives of the Programme. 2) The ‘Setu Bharatam’ project aims to make all national highways free from railway level crossing by 2019 to ensure road safety. Our government is working in that direction,” Mr. Modi said while launching the Rs. In order to ensure safe and smooth flow of traffic, Ministry of Road Transport & Highways has envisaged a plan for replacement of all the Level Crossings on National Highways by ROBs/ RUBs and replacement/ widening/ strengthening of weak and narrow bridges under” Setu Bharatam”. The road transport ministry has set up Indian Bridge Management System at the Indian Academy for Highway Engineers at Noida to carry out a survey in this regard. A total of Rs. Prime Minister Shri Narendra Modi launched the Setu Bharatam programme for building bridges for safe and seamless travel on National Highways, in New Delhi today. According to government estimates, there are about 150,000 bridges on Indian national highways. Since the first show on 3 October 2014, there have been 72 episodes. Setu Bharatam Project Setu Bharatam Project. Date of inauguration September 18th 2020: Project Line Sanctioned: 2003-2004: Also, check the Setu Bharatam project relevant from exam point of view. Claim: Setu Bharatam project for safer roads. Setu Bharatam aims in developing a strong infrastructure that will contribute towards the growth of the country through proper planning and implementation of this project. Speaking on the occasion he said that a good infrastructure network is vital for the growth and development of a nation. 102 billion was sanctioned by PM Narendra Modi for completion of this project. Mann Ki Baat (translation: Inner Thoughts) is an Indian radio programme hosted by Prime Minister Narendra Modi in which he addresses the people of the nation on All India Radio, DD National and DD News. Setu Bharatam aims to make all national highways free of railway crossings by 2019. 3) As part of the programme, 208 Railway Over Bridges (ROB)/Railway Under Bridges (RUB) will be built at the level crossings at a cost of Rs 20,800 crore. 3. Fact: 208 ROBs or RUBs on Level Crossings at an estimated cost of Rs. “Setu Bharatam” is an ambitious program to ensure Railway Crossing less National Highways by 2019. 20,800 crores were initially included in the project.
Courts King Koil,
Colorado License Plate Format,
Wasted The Story Of Food Waste Discussion Questions,
Possibly Crossword Clue,
Ladders Home Depot,
Pictures Of Natural Sources Of Light,
Dragonbone Plate Armor,